人妻斩h0930无码专区,www.日日射,欧洲熟妇牲XXXXX欧美老妇,天天婷婷

專業(yè)的太陽(yáng)能光伏支架制造商

skypeskype

新聞中心

晨科優(yōu)勢(shì)

關(guān)于晨科商業(yè)與戶用支架的更多解決方案 請(qǐng)點(diǎn)擊這里

了解更多

工程案例

查閱更多晨科客戶的實(shí)際工程案例 請(qǐng)點(diǎn)擊這里

關(guān)于我們

晨科有著多系列的支架方案,根據(jù)實(shí)際工程 做設(shè)計(jì),推出更多的性價(jià)比高的方案,了解 更多晨科 請(qǐng)點(diǎn)擊這里......
了解更多>>

企業(yè)新聞

給分布式光伏做好防水需要注意哪些?

Data:2023-02-21

目前國(guó)家以及地方政府都有出臺(tái)鼓勵(lì)新能源的發(fā)展,在光伏領(lǐng)域,分布式光伏支架系統(tǒng)的身影在越來越多地方出現(xiàn),成為備受青睞的太陽(yáng)能支架系統(tǒng)解決方案之一。
At present, the national and local governments have issued policies to encourage the development of new energy. In the solar field, residential and industrial solar mounting systems have emerged in more and more places, and become one of the most popular solar mounting system solutions.
 
下面我們來探討下分布式光伏里屋面防水的問題
Now let's discuss the problem of roof waterproofing in distributed solar
 
屋面防水處理的原則一般是通過導(dǎo)水槽達(dá)到排水的目的,即保證節(jié)點(diǎn)處理在暴雨積水時(shí)能順利的讓水瀉掉而保障屋面不漏。對(duì)于必須打孔破壞原屋面的情況,則要做到因地制宜,根據(jù)不同情況做不同處理,下面我們來具體分析下。
The principle of roof waterproof treatment is generally to achieve the purpose of drainage through the guide channel, that is, to ensure that the node treatment can smoothly let the water flow out and ensure that the roof does not leak when the storm water is accumulated. For the case that the original roof must be damaged by drilling, it is necessary to adjust measures to local conditions and make different treatment according to different conditions. Let's analyze it in detail.
 
混凝土平屋面光伏支架系統(tǒng)防水(Waterproofing of concrete flat roof solar mounting system

給分布式光伏做好防水需要注意哪些?

 
對(duì)于新建造的建筑,通常在設(shè)計(jì)建筑的時(shí)候就按照常規(guī)做法,預(yù)埋螺栓,做好屋面防水。而對(duì)于已經(jīng)建造完成的建筑,在設(shè)置太陽(yáng)能組件基座時(shí),防水層應(yīng)鋪設(shè)到基座和金屬埋件的上部,并在地腳螺栓周圍做密封處理,穿防水層處用防水密封膠填實(shí),另外可以在基座下增設(shè)附加防水層,這樣即使基座頂部發(fā)生滲漏,雨水也不會(huì)到達(dá)結(jié)構(gòu)層。
For newly built buildings, bolts are usually embedded and roof waterproofing is done according to the conventional practice when designing buildings. For the buildings that have been built, when setting the solar module base, the waterproof layer should be laid on the upper part of the base and the metal embedded parts, and the sealing treatment should be done around the anchor bolts. The waterproof layer should be filled with waterproof sealant. In addition, an additional waterproof layer can be added under the base, so that even if there is leakage at the top of the base, the rain will not reach the structural layer.

化學(xué)錨固螺栓光伏支架系統(tǒng)防水(Chemical anchor bolt solar mounting system waterproof)
 
對(duì)于混凝土平屋面的已有建筑,若使用化學(xué)錨固螺栓固定支架,應(yīng)首先確認(rèn)保護(hù)層或使用面層的厚度。對(duì)于單位面積承重較大的預(yù)制樓板屋面,可在屋面現(xiàn)澆一定厚度的混凝土層,固化后利用化學(xué)錨固螺栓固定支架。
For existing buildings with concrete flat roof, if chemical anchor bolts are used to fix the mounting, the thickness of the protective layer or the surface layer used shall be confirmed first. For the prefabricated floor roof with large bearing capacity per unit area, a certain thickness of concrete layer can be cast in place on the roof, and the mounting can be fixed with chemical anchor bolts after curing.
 
對(duì)于上覆瓦片的坡屋面,應(yīng)確認(rèn)打孔深度,將化學(xué)錨固螺栓固定后,螺栓穿過瓦片的位置應(yīng)使用防水密封膠做良好處理?;瘜W(xué)錨固螺栓具有承載能力大,抗疲勞、耐老化等優(yōu)勢(shì),對(duì)基體無膨脹力,不產(chǎn)生擠壓應(yīng)力,因此,不會(huì)對(duì)屋面防水造成不良影響。
For the sloping roof covered with tiles, confirm the drilling depth. After fixing the chemical anchor bolt, the position where the bolt passes through the tiles shall be well treated with waterproof sealant. The chemical anchor bolt has the advantages of large bearing capacity, fatigue resistance and aging resistance, and has no expansion force on the base and no extrusion stress. Therefore, it will not cause adverse impact on roof waterproofing.
 
金屬屋面光伏支架系統(tǒng)防水(Waterproofing of metal roof solar mounting system)

給分布式光伏做好防水需要注意哪些?

 
對(duì)于金屬屋面來說,需要將光伏系統(tǒng)的鋼結(jié)構(gòu)穿透原防水層及壓型鋼板,固定在建筑的主體鋼結(jié)構(gòu)上;再參照金屬屋面防水做法,進(jìn)行隔汽、保溫及防水處理。施工的重點(diǎn)是去銹蝕、密封、對(duì)基層及外圍涂刷防水涂料。
For the metal roof, the steel structure of the solar system needs to penetrate the original waterproof layer and profiled steel plate and be fixed on the main steel structure of the building; Then, steam insulation, thermal insulation and waterproof treatment shall be carried out with reference to the waterproof method of metal roof. The key points of construction are rust removal, sealing, and waterproof coating on the base and periphery.
 
對(duì)金屬屋面的局部漏點(diǎn),應(yīng)采用優(yōu)質(zhì)中性耐候密封膠涂抹封堵;對(duì)于局部銹蝕嚴(yán)重的彩鋼板,在安裝光伏組件前需要更換。
Local leakage points of metal roof shall be sealed with high-quality neutral weatherproof sealant; The color steel plate with serious local corrosion needs to be replaced before installing the PV module.
 
因此,光伏支架系統(tǒng)的安裝設(shè)計(jì)不僅要考慮日照和陰影,承重、排水、防水等細(xì)節(jié)同樣值得被關(guān)注。晨科已經(jīng)為全球100多個(gè)國(guó)家的用戶解決光伏支架系統(tǒng)難題,去過雪地,也去過高山,還有湖泊農(nóng)田,如果你不知道如何選擇一套合適的太陽(yáng)能支架解決方案請(qǐng)聯(lián)系我們!
Therefore, the installation design of solar mounting system should not only consider sunlight and shadow, but also pay attention to the details of load bearing, drainage and waterproof. Chiko has solved the problem of solar mounting system for users in more than 100 countries around the world, and has been to snow, mountains, lakes and farmland. If you don't know how to choose a suitable solar mounting solution, please contact us!



上海晨科太陽(yáng)能科技有限公司           地址:上海市嘉定區(qū)興文路680號(hào)
郵箱:chiko@chikolar.com               電話:+86-21-59972267
網(wǎng)站:glhot.cn                     傳真:+86-21-59972938


線上下單
聯(lián)系我們
黄色录像久久久免费| 国产妓女黄色片黄色片| 成人Av免费在现观看| 国产又大又硬又粗国内精品| 亚洲A级久久久| 日本一区二区色| 黄网站…麻豆……| 芳草影院| 久久www久久人爽精品人爽| 欧美国亚洲性色综合区| 鸡巴插美女逼逼的软件| 欧洲第一视频偷偷| 国产一区二区精品久久岳| 91精品国产高清一区二区三区| 亚洲成aV人在线视达达兔一区| 日日日干干干| 国产丨熟女丨国产熟| 国产亚洲欧美在线播放网| 香港三日本三级少妇少99| 国产精品无码一区二区无人区| 免费看无码超爽激情视频| 97国产免费小视频| 亚洲国产精品成人无码区| 火辣影院影音先锋| 国产精品午夜一级毛片密呀 | 99精品久久只有精品| 美女久久久亚洲国产| 狠狠狠色| 亚洲中文字幕一区二区无码| 四房播色综合久久婷婷| 亚洲成A∨人片在线观看无码不卡| 欧美天堂在线| 另类天堂专区| 久久精品国产亚洲AV无码麻豆| 国产亚洲另类欧美在线导航| 国产精品久久毛片免播| 美女被操国产AV| 亚洲日韩欧美一区视| 久久亚洲精品无码喷水| 胖女人一及毛片| 欧美黄片一二三四区|